- T
- D

Support Team Brazil's Mission Trip
0% complete
$1,100 raised of
6 donations
Team Brazil
10-day trip to Brazil with MainStreet Church
1. Wall construction: Build enclosures for a 5,000 ft² building by laying approximately 3,000 eight-inch concrete blocks to create 10-foot-high walls around a 300-foot perimeter.
2. Paving: Lay 3,000 ft² of concrete pavers for sidewalks and parking areas.
3. Additional work (time permitting): Electrical work, landscaping, and painting.
