Hi, my name is Connor O'Leary, and I am trying to raise funds for the development of a bridge in the Ruth Park woods as part of my Eagle Scout project. This bridge will cover a section of trail that is currently being developed and, as of now, uses unstable stones to traverse a small creek. Additionally, slightly upstream of the bridge site, there are all sorts of pottery and other miscellaneous items in the creek, which will be removed by this project.
Funds Break down
Internet # 202094183
2 x 4 x 12 ft. #2 Prime Ground Contact PT SYP Lumber
19
$6.62
$125.78
Internet # 203982364
6 x 6 x 8 ft. #2 Ground Contact PT Southern Pine Timber
4
$43.38
$173.52
Internet # 206939101
2 x 8 x 12 ft. #2 Prime Ground Contact PT SYP Lumber
6
$22.28
$133.68
Internet # 100318511
QUIKRETE 80 lb. High-Strength Concrete Mix
8
$6.47
$51.76
Internet # 100374921
Simpson Strong-Tie LUS28Z ZMAX Joist Hanger for 2x8
12
$2.83
$33.96
Internet # 336110542
DECKMATE #9 x 2-1/2 in. Exterior Deck Screws, 870-count
1
$74.21
$74.21
Internet # 202071152
Simpson SD #9 x 1-1/2 in. Connector Screws, 250-count
1
$15.98
$15.98
Internet # 321563345
Simpson SDWS 0.220 x 5 in. Exterior Timber Screws, 50-pack
1
$49.78
$49.78
Internet # 204633603
Everbilt 1/2 in.-13 x 8 in. Galvanized Carriage Bolts
12
$4.98
$59.76
Internet # 204276480
1/2 in. HDG Nuts and Washers (12 nuts, 24 washers)
2
$4.57
$9.14
Estimated Material Total: $727.57
approximate miscellaneous cost such as food, water, tool fees and other such expenses are estimated at around $150
final expected total $827
(not including tax or price increases for materials as well as differing stores)

Organizer and beneficiary
Jennifer O'Leary
Beneficiary



