Main fundraiser photo

KAR Animal Treatment Facility

Donation protected
Our Animal Rescue Centre high in the Besparmak Mountains in North Cyprus was established 20 years ago and currently provides care for over 350 dogs and 35 cats.  We receive no Government funding and rely on donations to keep the centre running.  
PROPOSED PROJECT – ANIMAL TREATMENT FACILITY PHASE 1
The aim is to refurbish/change the use of a room to an Animal Treatment / Veterinary use. There is a small detached building adjacent to the Kennel Block and opposite the Reception / Visitors centre which was originally used as a food preparation / kitchen / store area. This is now carried out elsewhere at the centre. The vacant building is in an ideal place to be used as an Animal treatment room, short term holding and separation area and for visiting Vets to use when necessary. It will be for the necessary health assessment and triage of new arrivals. The staff will also use it for examination of injuries, signs of suffering, vaccinations and administration of parasite treatments etc. Previously this work has been carried out in any clear area that can be found at the time. This room would also give a separate clean and secure environment in which to store medicines and medical supplies. Scope of work and Proposed Project Description The structure of the walls and roof are sound however the following requires making good or replacing:
1. Remove and replace existing door with new secure UPVC door.
2. Remove and replace two windows with new UPVC double glazed windows.
3. Block up old doorway and fit small UPVC double glazed window into upper half.
4. Seal and make safe Asbestos Roof.
5. Fit roof insulation and ceiling boards.
6. Refit broken floor tiles.
7. Establish electrical power supply, clean and test.
8. Replace lighting with new strip lighting and provide extra power points.
9. Fit new wall tiles a third up of the walls.
10.Remove old sink unit, fit new wash hand basin and taps and extention for the fitting of a dog wash unit. 11.Fit hot water system - 6mtr tower, cold & hot water cylinder and solar panels.
12.Rebuild of existing drainage system.
13. Remove old paint from existing interior and exterior and make good new with rubberised paint.
14. Supply and fit Air Conditioning/Heating unit. 15.Supply and fit two 3metre lengths of floor cupboards with worktop and two 3metre lengths of wall cupboards.
COSTINGS: Total costs to include all materials and labour: £5,360

Organizer

Patricia Garrod
Organizer

Your easy, powerful, and trusted home for help

  • Easy

    Donate quickly and easily.

  • Powerful

    Send help right to the people and causes you care about.

  • Trusted

    Your donation is protected by the  GoFundMe Giving Guarantee.